Pages Navigation Menu

Suez Nantong waste-to-energy plant optimizes maintenance and overhaul with Coswin 8i

Posted on 2016-10-28

Suez Nantong waste-to-energy plant optimizes maintenance and overhaul with Coswin 8i

In March 2014, Suez Environnement subsidiary SITA Waste Services established a joint venture with Shanghai Chemical Industry Park Investment Corporate (SCIP) and Nantong Economic Technology and Development Area Company (NETDA) for the construction and operation of a new hazardous waste plant in the Nantong Economic Technology and Development Area.

read more

BIM for building asset integrity management

Posted on 2016-07-4

BIM for building asset integrity management

With the promotion on the “Smart City” concept, all walks of life put forward their own version of “Smart”. China National Offshore Oil Corporation (“CNOOC”), as one of the three major oil companies in China, has established a dedicated office to manage the integrity of equipment and facilities, and had proposed the concept of “Smart Offshore Oil” based on the digital management on the full lifecycle of equipment and facilities.

read more

Maintenance preparation support for Indonesia’s Banjarsari power plant with CNEEC

Posted on 2016-05-31

Maintenance preparation support for Indonesia’s Banjarsari power plant with CNEEC

PT Bukit Asam (PTBA) is an Indonesian state-owned coal mining company, partly listed on the Indonesian stock exchange. The second largest coal producer in Indonesia, with mineable reserves of approximately 7.3 billion tons, PTBA strives to become a competitive energy company. The 2x135MW power plant, a total investment of 240M USD, is located in South Sumatra province. China National Electric Equipment Corporation (CNEEC) was selected as the EPC contractor for this project. Construction started in April 2012.

read more

The difference between Planning and Scheduling

Posted on 2016-05-3

The difference between Planning and Scheduling

Too many people confuse Planning and Scheduling, two related but different processes. In this brief article, we would like to clarify the difference between the two.

read more

Hazardous waste incineration plant optimizes plant inspections with bluebee® mobile solution

Posted on 2016-05-3

Hazardous waste incineration plant optimizes plant inspections with bluebee® mobile solution

The bluebee® project aim was to improve the quality of maintenance by standardizing the inspection content (such as routine and daily inspection) and increasing the reliability of data coming from the field. The use of bluebee® was to eliminate the traditional paper work orders from the CMMS system and help establishing a real inspection database for diagnosis and performance analysis.

read more

Scheduling with Coswin 8i: the Organizer tool

Posted on 2016-05-3

Scheduling with Coswin 8i: the Organizer tool

In this Tips & Tricks, we would like to briefly outline the Coswin 8i Scheduling tool. For more on the differences between Planning and Scheduling, see this Reliability article. Talk to your Siveco consultant for more details! There are two main ways to use this advanced scheduling tool:

read more
Follow us
on WeChat